Earlsburn Wind Farm Extension

Naturalis carried out extensive community and stakeholder consultation for an 11 turbine proposal with turbines up to 180m to blade tip height, battery energy storage and ancillary infrastructure. The application for consent was submitted under Section 36 of the Electricity Act 1989 to the Energy Consents Unit (ECU) in December 2022. 

During consultation on the application Historic Environment Scotland (HES) objected to the proposal because of the impacts the turbines would have on the views from two scheduled monuments; Carleatheran Cairn and Stirling Castle.

Naturalis has redesigned the scheme to address HES concerns and have submitted Further Environmental Information (FEI) to the ECU to accompany the Section 36 application. The FEI updates, where necessary, those environmental assessments previously carried out for the 11 turbine proposal. There will be a formal ECU consultation period on the FEI from 7 March 2025 to 7 April 2025, although Scottish Ministers may consider representations made after this date.

The project reference is ECU00004510 and all documents relating to the planning submission can be viewed on the ECU’s website. Copies of the FEI and the original application are also available to download below. Hard copies of all documents are subject to a charge of £1,000 and are available on request (telephone 0141 418 0471 or email earlsburnextension@rsk.co.uk) and £15 per copy on a USB storage device. Copies of a short Non-Technical Summary are available free of charge. If you have any questions on the proposal or would like any further information, please contact earlsburnextension@rsk.co.uk.

All previous representations received by Scottish Ministers in relation to the application remain valid. Any new representations on the application may be submitted by email to the Scottish Government via representations@gov.scot; or by post to the Scottish Government, Energy Consents Unit, 4th Floor, 5 Atlantic Quay, 150 Broomielaw, Glasgow, G2 8LU, identifying the proposal and specifying the grounds for representation. Written or emailed representations should be dated, clearly stating the name (in block capitals) and full postal address of those making representations. Emailed representations should also include the full return email address of those making representations.

Site Name

Earlsburn Extension

Location

2.2km south of Gargunnock

Proposed Turbine Height

3 turbines with a blade tip height of up to 149.9m and 4 with a blade tip height of up to 135m*

Planning Authority

Stirling Council

Predicted Community Benefit Fund

£160,000 per year**

Status

Live Application

* Previous Proposed Turbine Height: 11 turbines with a blade tip height up to 180m

Site Location

Further Environmental Information (2025)

Cover Letter, Public Notice and Consultee Notice

Cover Letter
Public Notice
Additional Information - Consultee Notice

Supporting Information

Addendum to the PAC Report
Additional Information - Addendum to the PAC Report
Additional Information - Addendum to the PAC Report, Appendix 4 Consultation Materials - Exhibition Boards
Additional Information - Addendum to the PAC Report, Appendix 4 Consultation Materials - Visualisations

Revised Planning Statement
Additional Information - Revised Planning Statement

 FEI Report Cover Pages

FEI Report - Volume 1 Cover Page and Contents
FEI Report - Volume 2 Cover Page, Contents and Glossary
FEI Report - Volume 3a Cover Page and Contents
FEI Report - Volume 3b Cover Page and Contents
FEI Report - Volume 3c Cover Page and Contents
FEI Report - Volume 4 Cover Page and Contents

Volume 1 - Non-technical Summary

Additional Information - Volume 1, Non-technical Summary

Volume 2 - Main FEI Report

Additional Information - Volume 2, Chapter 01-05 - Introductory Chapters
Additional Information - Volume 2, Chapter 06 - Landscape and Visual
Additional Information - Volume 2, Chapter 07 - Ecology
Additional Information - Volume 2, Chapter 08 - Ornithology
Additional Information - Volume 2, Chapter 09 - Geology, Hydrogeology, Hydrology and Peat
Additional Information - Volume 2, Chapter 10 - Cultural Heritage
Additional Information - Volume 2, Chapter 11 - Traffic and Transport
Additional Information - Volume 2, Chapter 12 - Noise and Vibration
Additional Information - Volume 2, Chapter 13 - Aviation and Radar
Additional Information - Volume 2, Chapter 14 - Socio-economics, Recreation, Tourism and Land Use
Additional Information - Volume 2, Chapter 15 - Other Issues

Volume 3 - Figures and Visualisations

Volume 3a - Figures

01-05 Introductory Chapters

Additional Information - Updated Figure 1.1 Site Location Plan
Additional Information - Updated Figure 1.2 Application Boundary
Additional Information - Updated Figure 1.3 Site Aerial Context
Additional Information - Updated Figure 3.1 Environmental Considerations
Additional Information - New Figure 3.4 Design Iteration from EIAR to FEI
Additional Information - Updated Figure 4.1 Site Layout Plan
Additional Information - Updated Figure 4.2 Indicative Turbine Elevation
Additional Information - Updated Figure 4.4 Indicative Turbine Foundation
Additional Information - Updated Figure 4.5 Indicative Crane Hardstanding
Additional Information - Updated Figure 4.11 Indicative Battery Energy Storage Facility

06 Landscape and Visual

Additional Information - New Figure 6.1 Bareground Zone of Theoretical Visibility
Additional Information - New Figure 6.2 Zone of Theoretical Visibility including Woodland and Settlement
Additional Information - New Figure 6.3 Comparative Zone of Theoretical Visibility
Additional Information - New Figure 6.4 Topography and Landcover
Additional Information - New Figure 6.5 Landscape Character
Additional Information - New Figure 6.6 Landscape Character with Visibility
Additional Information - New Figure 6.7 Visual Receptors
Additional Information - New Figure 6.8 Cumulative Developments
Additional Information - New Figure 6.9 Cumulative Zone of Theoretical Visibility Operational and Consented
Additional Information - New Figure 6.10 Cumulative Zone of Theoretical Visibility Wind Farms in Planning

07 Ecology

Additional Information - Updated Figure 7.1 Ecological Survey Areas
Additional Information - Updated Figure 7.2 Natural Heritage Designated Sites
Additional Information - Updated Figure 7.3a Phase 1 Habitats - Site Access
Additional Information - Updated Figure 7.3b Phase 1 Habitats - Site
Additional Information - Updated Figure 7.4a National Vegetation Classification - Site Access
Additional Information - Updated Figure 7.4b National Vegetation Classification - Site Access
Additional Information - Updated Figure 7.4c National Vegetation Classification - Site Access
Additional Information - Updated Figure 7.4d National Vegetation Classification - Site Access
Additional Information - Updated Figure 7.4e National Vegetation Classification - Site Access
Additional Information - Updated Figure 7.4f National Vegetation Classification - Site
Additional Information - Updated Figure 7.4g National Vegetation Classification - Site
Additional Information - Updated Figure 7.5a Protected Species Survey Results - Site Access
Additional Information - Updated Figure 7.5b Protected Species Survey Results - Site
Additional Information - Updated Figure 7.6 Bat Activity Survey Results
Additional Information - Updated Figure 7.7 Indicative Habitat Enhancement Areas

08 Ornithology

Additional Information - Updated Figure 8.1a Ornithological Survey Areas - Proposed Development
Additional Information - Updated Figure 8.1b Ornithological Survey Areas - Adjacent Wind Farms
Additional Information - Updated Figure 8.2 Relevant Designated Sites
Additional Information - Updated Figure 8.3 Breeding Bird Survey Results - Waders
Additional Information - Updated Figure 8.4a Flight Activity by Target Species (Sep 2020 to Mar 2021)
Additional Information - Updated Figure 8.4b Flight Activity by Target Species (Apr to Aug 2021)
Additional Information - Updated Figure 8.4c Flight Activity by Target Species (Sep 2021 to Mar 2022)
Additional Information - Updated Figure 8.4d Flight Activity by Target Species (Apr to Aug 2022)
Additional Information - Updated Figure 8.5a Index of Red Kite Flight Activity (Sep 2020 to Mar 2021)
Additional Information - Updated Figure 8.5b Index of Red Kite Flight Activity (Apr to Aug 2021)
Additional Information - Updated Figure 8.5c Index of Red Kite Flight Activity (Sep 2021 to Mar 2022)
Additional Information - Updated Figure 8.5d Index of Red Kite Flight Activity (Apr to Aug 2022)
Additional Information - New Figure 8.6 Flight Activity by Target Species (Oct 2024 to Dec 2024)

09 Geology, Hydrogeology, Hydrology and Peat

Additional Information - Updated Figure 9.3 Peat Depth

11 Traffic and Transport

Additional Information - Updated Figure 11.4 Peak Construction Trip Generation
Additional Information - New Figure 11.5 Non-abnormal Load Construction Traffic Route

12 Noise

Additional Information - New Figure 12.1 Map showing layout of the Proposed Development and Surrounding Area

14 Socio-economics

Additional Information - Updated Figure 14.1 Socio-economic receptors

Volume 3b - Landscape and Visual Impact Assessment Visualisations

Additional Information - Landscape and Visual Impact Assessment Visualisations

Volume 3c - Cultural Heritage Visualisations

Additional Information - Volume 3c, Cultural Heritage Visualisations

Volume 4 - Technical Appendices

01-05 Introductory Chapters

Additional Information - Volume 4, Updated Technical Appendix 5.1 Schedule of Environmental Commitments

06 Landscape and Visual

Additional Information - New Technical Appendix 6.1 Methodology
Additional Information - New Technical Appendix 6.3a Landscape Sensitivity - LCT1
Additional Information - New Technical Appendix 6.5 A811 & A873 Wirelines
Additional Information - New Technical Appendix 6.6 Illustrative Views
Additional Information - New Technical Appendix 6.7 Effects less than Moderate
Additional Information - New Technical Appendix 6.9 Residential Visual Amenity Assessment
Additional Information - New Technical Appendix 6.10 Comparison of Effects with EIAR

07 Ecology

Additional Information - Technical Appendix 7.3 Peatland Condition Assessment and Outline Habitat Management Plan Report

08 Ornithology

FEI Report - Updated Figure 8.2 Bird Collision Risk Model Results

09 Hydrology

Figures supporting TA's

FEI Report - Updated Figure 9.1.1 Slope Mapping
FEI Report - Updated Figure 9.1.2 Geomorphological Mapping
FEI Report - Updated Figure 9.1.3a Peat Depth Overview
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 1 of 9
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 2 of 9
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 3 of 9
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 4 of 9
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 5 of 9
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 6 of 9
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 7 of 9
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 8 of 9
FEI Report - Updated Figure 9.1.3b Peat Depth Detail - Map 9 of 9
FEI Report - Updated Figure 9.1.4 Likelihood Rating
FEI Report - Updated Figure 9.1.5 Consequence Rating
FEI Report - Updated Figure 9.1.6 Risk Rating
FEI Report - Updated Figure 9.4.1 - Potentially Groundwater-Dependent Terrestrial Ecosystems
FEI Report - Updated Figure 9.5.1 Watercourse Crossing Locations

11 Traffic and Transport

Additional Information - Volume 4, New Technical Appendix 11.3 Stage 1 Road Safety Audit
Additional Information - Volume 4, New Technical Appendix 11.4 A811-Touch Road Junction Modelling Report

12 Noise

Additional Information - New Technical Appendix A12.1 Noise Survey and Modelling

15 Other Issues

Additional Information - Updated Technical Appendix 15.1 Carbon Calculator

 

Original Application (2022)

Section 36 Public Notice [download]

Application Documents

Volume 1 - Non-Technical Summary


Volume 2 - Main Text

Covers, Contents and Glossary

Chapter 01: Introduction

Chapter 02: Planning and Energy Policy

Chapter 03: Site Selection and Design Evolution

Chapter 04: Project Description

Chapter 05: Construction, Operation and Decommissioning

Chapter 06: Landscape and Visual Impact Assessment

Chapter 07: Ecology

Chapter 08: Ornithology

Chapter 09: Geology, Hydrogeology, Hydrology and Peat

Chapter 10: Cultural Heritage and Archaeology

Chapter 11: Traffic and Transportation

Chapter 12: Noise and Vibration

Chapter 13: Aviation and Radar

Chapter 14: Socia-Economic Impact Assessment

Chapter 15: Other Issues


Volume 3a - Figures

Covers, Contents and Glossary

Figure 1.1 - Site Location Plan

Figure 1.2 - Application Boundary

Figure 1.3 - Site Aerial Context

Figure 3.1 - Design Iterations

Figure 3.2 - Design Iteration Through the Garden

Figure 3.3 - Environmental Considerations

Figure 4.1 - Site Layout

Figure 4.2 - Indicative Wind Turbine Elevation

Figure 4.3 - Indicative External Transformer

Figure 4.4 - Indicative Turbine Foundation

Figure 4.5 - Indicative Crane Hardstanding

Figure 4.6 - Indicative Construction Compound

Figure 4.7 - Indicative Control Room

Figure 4.8 - Site Access Details

Figure 4.9 - Indicative Track Details

Figure 4.10 - Indicative Cable Trench Details

Figure 4.11 - Indicative Battery Energy Storage

Figure 4.12 - Indicative Switching Station

Figure 4.13a - GDL Crossing - Option C Swept Path Sheet 1

Figure 4.13b - GDL Crossing - Option C Swept Path Sheet 2

Figure 4.13c - GDL Crossing - Option C Swept Path Sheet 3

Figure 6.1 - Zone of Theoretical Visibility (Blade Tip) - Bare Ground

Figure 6.2 - Zone of Theoretical Visibility (Hub Height) - Bare Ground

Figure 6.3 - Zone of Theoretical Visibility with Screening Effect of Woodland and Settlement

Figure 6.4 - Landscape Planning Context

Figure 6.5 - Landscape Character

Figure 6.6 - Landscape Character with ZTV

Figure 6.7 - Topography and Landcover

Figure 6.8 - Recreational Receptors

Figure 6.9 - Cumulative Location Plan

Figure 6.10 - Cumulative ZTV Operational and Consented

Figure 6.11 - Existing Light Environment and Key Receptors

Figure 6.12 - Zone of Theoretical Visibility Aviation Tower Lights

Figure 6.13 - Zone of Theoretical Visibility Aviation Hub Lights

Figure 7.1 - Ecological Survey Areas

Figure 7.2 - Natural Heritage Designated Sites

Figure 7.3a - Phase 1 Habitats - Site Access

Figure 7.3b - Phase 1 Habitats - Site

Figure 7.4a - National Vegetation Classification - Site Access

Figure 7.4b - National Vegetation Classification - Site Access

Figure 7.4c - National Vegetation Classification - Site Access

Figure 7.4d - National Vegetation Classification - Site Access

Figure 7.4e - National Vegetation Classification - Site

Figure 7.4f - National Vegetation Classification - Site

Figure 7.4g - National Vegetation Classification - Site

Figure 7.5a - Protected Species Survey Results - Site Access

Figure 7.5b - Protected Species Survey Results - Site

Figure 7.6 - Bat Activity Survey Results

Figure 7.7 - Indicative Habitat Enhancement Areas

Figure 8.1a - Ornithological Survey Areas (Proposed Development)

Figure 8.1b - Ornithological Survey Areas (Adjacent Wind Farms)

Figure 8.2 - Relevant Designated Sites

Figure 8.3 - Breeding Bird Survey Results - Waders 2021-22

Figure 8.4a - Flight Activity by Target Species (Sep 2020 to Mar 2021)

Figure 8.4b - Flight Activity by Target Species (Apr to Aug 2021)

Figure 8.4c - Flight Activity by Target Species (Sep 2021 to Mar 2022)

Figure 8.4d - Flight Activity by Target Species (Apr to Aug 2022)

Figure 8.5a - Index of Red Kite Flight Activity (Sep 2020 to Mar 2021)

Figure 8.5b - Index of Red Kite Flight Activity (Apr to Aug 2021)

Figure 8.5c - Index of Red Kite Flight Activity (Sep 2021 to Mar 2022)

Figure 8.5d - Index of Red Kite Flight Activity (Apr to Aug 2022)

Figure 9.1a - Bedrock Geology

Figure 9.1b - Superficial Geology

Figure 9.2 - Peat Soil Carbon

Figure 9.3 - Peat Depth

Figure 9.4 - Hydrological Catchments

Figure 9.5 - Private Water Supplies

Figure 10.1 - Cultural Heritage Assets in the Inner Study Area

Figure 10.2 - Cultural Heritage Assets in the Outer Study Area

Figure 11.1 - Traffic Study Area

Figure 11.2 - Traffic Count Points

Figure 11.3 - Traffic Accident Data

Figure 11.4 - Construction Trip Generation

Figure 13.1 - Visual Flight Rules 250k Chart Extract

Figure 14.1 - Socio-Economic Tourism and Recreation Receptors Local

Figure 15.1 - Wind Farm Felling Areas

Figure 15.2 - Existing Forestry Breaks


Volume 3b – LVIA VPS and cover, contents page

Illustrative Viewpoint A - Flanders Moss

Illustrative Viewpoint B - B9124 West of Cowe

Illustrative Viewpoint C - Conic Hill

Illustrative Viewpoint D - Ben Ledi

Illustrative Viewpoint E - Touch Road

Volume 6.13 - VP01

Volume 6.14 - VP02

Volume 6.15 - VP03

Volume 6.16 - VP04

Volume 6.17 - VP05

Volume 6.18 - VP06

Volume 6.19 - VP07

Volume 6.20 - VP08

Volume 6.21 - VP09-01

Volume 6.21 - VP09-02

Volume 6.22 - VP10

Volume 6.23 - VP11

Volume 6.24 - VP12

Volume 6.25 - VP13

Volume 6.26 - VP14

Volume 6.27 - VP15

Volume 6.28 - VP16

Volume 6.29 - VP17

Volume 6.30 - VP18

Volume 6.31 - VP19

Volume 6.32 - VP20


Volume 3c – CHVPs and cover, contents page

Volume 10.3 - CHVP1

Volume 10.4 - CHVP2

Volume 10.5 - CHVP3

Volume 10.6 - CHVP4

Volume 10.7 - CHVP5

Volume 10.8 - CHVP6

Volume 10.9 - CHVP7

Volume 10.10 - CHVP8


Volume 4 - Technical Appendices

Cover and Contents

Volume 4 - 5.1 - Schedule of Environmental Commitments

Volume 4 - 6.1 - Methodology

Volume 4 - 6.2 - Visual Aids

Volume 4 - 6.3 - Landscape Sensitivity

Volume 4 - 6.4 - Viewpoint Analysis

Volume 4 - 6.5 - Sequential Wirelines – A811 & A873

Volume 4 - 6.6 - Shelloch VP12

Volume 4 - 6.7 - Effects Less than Moderate

Volume 4 - 6.8 - Impact of Special Landscape Qualities of the Loch Lomond and Trossachs National Park

Volume 4 - 6.9 - Residential Visual Amenity Assessment

Volume 4 - 7.1 - Ecological Desk Study and Survey Results

Volume 4 - 7.2 - Outline Species Protection Plans

Volume 4 - 8.1 - Ornithological Desk Study and Survey Report

Volume 4 - 8.2 - Collision Risk Modelling Report

Volume 4 - 8.3 - Outline Bird Protection Plan

Volume 4 - 9.1 - Peat Slide Risk Assessment

Volume 4 - 9.2 - Outline Peat Management Plan

Volume 4 - 9.3 - Borrow Pit Assessment

Volume 4 - 9.4 - Groundwater Dependent Terrestrial Ecosystem Assessment

Volume 4 - 9.5 - Drainage Impact and Watercourse Crossing Assessment

Volume 4 - 10.1 - Cultural Heritage Baseline S1 Settings Assessment

Volume 4 - 11.1 - Abnormal Route Load Assessment

Volume 4 - 11.2 - Construction Traffic Management Plan

Volume 4 - 12.1 - Noise

Volume 4 - 13.1 - Aviation Lighting Assessment

Volume 4 - 15.1 - Carbon Calculator and Output

Planning Statement

Pre-Application Consultation Report